Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White
- SKU:
- SWR04W
- MPN:
- ZE-200S WHITE
- Function:
- On/Off
- Length:
- 0.625 (5/8in)
- Width:
- 0.625 (5/8in)
- Height:
- 0.437 (7/16in)
- Type:
- Switch - Fixture - Toggle
- Color/ Finish:
- White
- Voltage (Max):
- 125V, 250V
- Certification:
- cRUus
Bulk discount rates
Below are the available bulk discount rates for each individual item when you purchase a certain amount
Buy 10 - 99 | and pay only $1.20 each |
Buy 100 or above | and pay only $1.05 each |
Description
Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White.
Features
- Rated Maximum 6A-125V, 3A-250V.
- Measures 7/16in L X 1/4in W
Documentation