Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White

SKU:
SWR04W
MPN:
ZE-200S WHITE
Function:
On/Off
Length:
0.625 (5/8in)
Width:
0.625 (5/8in)
Height:
0.437 (7/16in)
Type:
Switch - Fixture - Toggle
Color/ Finish:
White
Voltage (Max):
125V, 250V
Certification:
cRUus

Bulk discount rates

Below are the available bulk discount rates for each individual item when you purchase a certain amount

Buy 10 - 99 and pay only $1.20 each
Buy 100 or above and pay only $1.05 each
  • Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White
  • Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White
  • Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White
  • Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White
$1.50

Description

Mini On-Off Snap-In Rocker Switch with 6in Long Leads - White.

Features

  • Rated Maximum 6A-125V, 3A-250V.
  • Measures 7/16in L X 1/4in W

Documentation

View AllClose